Testimonial BY Ben Boettcher

Project Manager – Condev Construction The Village at Yeronga Building 4 Project (60 units Aged Care Independent Living).

Originally the render system’s specified for the project was a Rockcote Acrylic System, however due to the cost of the system and both Blockwork and Concrete substrates which were not 100% perfect, I needed to work with a supplier that could provide a 10 year warranty on the finish but also be able to meet the budget price for the works. Having known Mark and the extended Nizeti family for a while through the industry I knew Mark and Ezy Coat could provide both the system and the technical support required for such an important project for the Condev business. In the end we went for a two coat ECA Render and the Ezy Coat Sand 800 Acrylic Render, the end result was a great system and a great finished product. The end result was good enough for the Architect to specify the system for the Building 5 project which will be a 97 unit development, and for myself to use the koolwall insulated panel system and the same ECA Render and Sand 800 System for my house renovation, in which I will also utilise the Ezy Coat 3 coat system.

In addition to the great technical system is the fact that the business and its owners are local always contactable and the materials always available.

client-condev

Write a Comment

Your email address will not be published.